Inside Our Project – Balmoral Renovation – Week 2 & 3

19 August 2015
1634 Views
Comments are off for this post

It has been a busy couple of weeks at our Balmoral Renovation.  Plastering, plumbing, electrical, tiling just to name a few of the jobs to be ticked off the list.

Guest Bedroom

In the guest bedroom, the walls have been plastered and sanded.  The 10 lite french doors supplied by The Woodworkers have been installed.  Louvres have also been installed either side of the french doors.

 IMG_7050

 

Laundry

We are extremely pleased with how the laundry has turned out!  Tiling, cabinetry and splashback have been completed and is now ready for painting.

We chose Classic White from the Polytec range for the cabinetry and Casastone Matt for the benchtop.   The floor tiles were supplied by Beaumont Tiles and we chose the Evolution Grey 300x600mm porcelain tile.   These floor tiles are also used in the bathroom and hallway.  For the splashback we chose to use a Gloss White 300x600mm tile.  Once again, this tile was used for the bathroom walls.

 

Bathroom

The bathroom is ready for the plumber to fit off & the glass supplier to install the shower screen.

IMG_7052

Carport

The carport has been constructed and the roof is on.  We selected Shale Grey Colorbond for the roof and Nightsky Colorbond for the gutters.

The end result is in site for our Balmoral Renovation. Electrical and plumbing fit off and painting to be completed in the next week . It wont be long till our clients can enjoy this new area of their home. We are excited to show you the finished product in the next couple of weeks!